Capstone Assignment – Conveyor Belt Project In this capstone project, you will a

Capstone Assignment – Conveyor Belt Project
In this capstone project, you will assume the role of a project manager and oversee the implementation of a new computer-controlled conveyor belt.
Instructions
The new computer-controlled conveyor belt is an exciting project that moves and positions items on the conveyor belt within <1 millimeter. The project will produce a new system for future installations, and for replacement of those in the field, at a low cost. The computer-controlled conveyor belt has the potential to be a critical unit in 30 percent of the systems installed in factories. The new system is also easier to update with future technologies. The project priority matrix for the Conveyor Belt Project (CBP) is:
Time Scope Cost
Constrain X    
Enhance   X  
Accept     X
This table has been completed to assist you in completing the capstone project:
Conveyor Belt Project (CBP)
Hardware
Hardware specifications
Hardware design
Hardware documentation
Prototypes
Order circuit boards
Assemble preproduction models
Operating System
Kernel specifications
Drivers – Disk drivers
Drivers – Serial I/O drivers
Memory management
Operating system documentation
Network interface
Utilities
Routine utilities
Complex utilities
Shell
System Integration
Architectural decisions
Integration first phase
System hardware/software test
Project documentation
Integration acceptance testing
This assignment must be in APA 7 formatLinks to an external site. (title page, body, and references page) and must include all cited sources, including figures and tables, in your references page. The Conveyor Belt Project must be between six and nine pages, excluding the title and references pages. 
Review the Information page above.
THIS IS WHAT NEEDS TO BE DONE FIRST BELOW:
Create your project charter by completing the following:
Identify your project name.
Define and assess project scope and project risks.
Create project timeline.
Create a high-level project budget.
Create a list of project team roles and responsibilities.